Get a resin driveway quote

A useful quote needs the size of the drive, what’s there now, and whether the base and edges have to be rebuilt. Use the form when it is live, or contact a firm in the directory with the same details.

This form is not live yet. Nothing you type here is sent or stored. When the site’s domain is set up, the form will email us and, only if you consent, pass the enquiry to an installer covering your area. Until then, please use the directory to contact firms directly, or email [email protected].

Placeholder form — submit is disabled.

When this form is switched on, we will only use your details to reply and, if you tick a consent box, to pass the enquiry to an installer. See our privacy notice.

What to send so a quote is comparable

Installers price very different jobs under the same heading. Ask each firm to put the following in writing, then compare like with like. For why the system matters, see resin bound vs resin bonded; for typical published prices, see the cost guide.

  1. The area in square metres, measured on site, not guessed from a photo.
  2. Whether the existing surface can be overlaid, or must be excavated and replaced.
  3. The base build-up: what goes underneath, whether it is permeable (for example an open-graded sub-base), and whether that is included.
  4. Edging: is a new edge required, in what material, and is it priced per metre?
  5. Drainage: does water go through the surface and the base, or to a channel, lawn or soakaway? Who is responsible if a front drive needs to meet the planning rules?
  6. The system: resin bound or resin bonded, the finished thickness, and the aggregate blend.
  7. UV-stable resin or not, stated clearly, because some guides say this changes both the look and the price.
  8. What’s included: excavation, waste removal, sub-base, edging, drainage, the resin surface, VAT, and any making-good of lawns or paths.
  9. The guarantee: length, whether it covers workmanship, the product, or both, and whether it is insurance-backed.
  10. Timescale and curing: days on site, and how long before you can walk or drive on it.
  11. Payment terms and cancellation rights, especially if you agree the contract at home, by phone or online. Citizens Advice and the Consumer Contracts Regulations 2013 are the starting point for cooling-off rules; ask the firm to put its terms in writing.

Or browse installers yourself

Until the form is live, the quickest route is the directory. Firms are listed alphabetically, with the area they say they cover.